KK968 for new swimming pool?

Work Method:

  1. Clean the entire surface by using high pressure water gun.
  2. Apply diluted KK233 as penetration then original KK233 as basecoat.
  3. Apply few layers of KK968 (≈1mm) at vertical side walls by crossing method.
  4. Then, apply few layers of KK968 (≈2mm) on horizontal floor by crossing method.
  5. Strictly allow 48 hours of curing time for KK968 fully dry before the water test.
  6. Lastly, apply cement screeding and install the tiles at the swimming pool.
× The above method is only for suggestion, please refer to professional or contact us for any others inquiries.

Share This:

© 2019 King Kote. All Rights Reserved. Designed by PAKO®
Back to top